Advance Geometry Tool
Pipeline Geometry Inspection
Pigging of Basin Bridge Pipeline Between HPCL cassimode and Basin Bridge for removal of product (Furnace Oil) from pipeline and cleaning of pipeline.
Procedure for Decommissioning and cleaning activity, Technical design and engineering support for Fabrication and installation of temporary Receiver header, required cleaning pigs, trained technical personnel for execution of the project, complete project management and execution on site launching/Receiving of pigs, removal of Product from pipeline and cleaning of pipeline.
The above project Scope of work was completed by M/s. Athena Powertech LLP, Vadodara along with M/s. Manuel Correya Engineering Contractor, Chennai.